EPC POWER SOLUTIONS

Power equipment engineered around your EPC project.

Project-specific transformers, MV distribution and substation packages aligned with your load profile, grid requirements and delivery schedule.

  • Renewable Energy
  • Mining & Heavy Industry
  • Infrastructure
  • Critical Facilities
Renewable energy substation and transformer project

Typical EPC power path

Generation Step-up MV collection Grid
PROJECTGrid-connected power
01System-led selection
02Project-specific design
03Factory testing
04EPC documentation

SYSTEM APPROACH

Think beyond the transformer.

Equipment performs best when every electrical interface is considered together. We configure the package around the complete project power chain, not an isolated nameplate.

01Source / Utility
02Power Transformer
03MV Distribution
04Protection & Control
05Load / Grid
ZISHENG ENGINEERING FOCUS

Capacity, voltage ratio, impedance, cooling, insulation and protection interfaces are coordinated with the project architecture.

PROJECT SCENARIOS

Engineered for the way your site operates.

Different projects place different stresses on the power system. Select the scenario closest to your application.

Renewable energy substation project01

Solar · Wind · BESS · Hybrid

Renewable Energy

Transformer and MV packages coordinated with inverter or PCS output, collection voltage and utility grid requirements.
  • Grid code
  • Bidirectional duty
  • Outdoor environment
Discuss this application
Industrial power transformer installation02

Mining · Cement · Steel · Processing

Mining & Heavy Industry

Heavy-duty power systems designed around motor starting, high fault levels, thermal duty and continuous production.
  • Heavy load
  • Motor starting
  • Harsh environment
Discuss this application
Prefabricated substation for infrastructure project03

Utilities · Factories · Public Works

Infrastructure & Manufacturing

Scalable distribution architectures that support production reliability, facility expansion and power-quality needs.
  • Reliability
  • Expansion
  • Power quality
Discuss this application
Commercial building transformer and switchgear installation04

Data Centers · Hospitals · Commercial

Critical Facilities

Compact, safe and efficient transformer systems coordinated with redundancy, harmonic loads and indoor constraints.
  • Critical power
  • Low loss
  • Safety
Discuss this application

EPC DELIVERY WORKFLOW

Engineering clarity from inquiry to site.

A practical review-and-delivery sequence built for EPC technical and commercial coordination.

01

Requirement review

We align load, voltage, grid code, site conditions and project schedule before equipment selection.

02

Coordinated engineering

Transformer, switchgear, protection and substation interfaces are reviewed as one electrical system.

03

Technical submittal

Datasheets, drawings and specifications are prepared for EPC review and approval.

04

Manufacturing & FAT

Production and factory testing follow the approved technical scope and inspection plan.

05

Delivery support

Packing, shipping documents and remote installation or commissioning support are coordinated with the project.

COORDINATED PACKAGE

Equipment built around one project scope.

Choose a single equipment category or combine them into an integrated package with aligned ratings and interfaces.

Transformer Systems

Project-specific voltage transformation for generation, utility incoming and facility distribution.

  • Step-up transformers
  • Oil-immersed transformers
  • Dry-type transformers
  • Special-duty designs

MV Distribution

Switching, protection and isolation coordinated with transformer ratings and the network fault level.

  • MV switchgear
  • Ring main units
  • Protection relays
  • Metering systems

Substation Packages

Factory-integrated solutions that reduce site work and simplify electrical interface management.

  • Compact substations
  • Prefabricated substations
  • Transformer skids
  • Integrated E-houses

Auxiliary Systems

Supporting distribution, control and monitoring equipment for a complete project power package.

  • LV switchboards
  • Motor control centers
  • Protection & control
  • Monitoring & metering

FASTER TECHNICAL RESPONSE

Start with six project inputs.

Send what is available. Our engineering team can identify gaps and help structure the transformer and MV equipment requirements.

01

Capacity & load profile

Connected load, demand factor, generation or storage power, motor starting and future expansion.

02

System voltage

Utility incoming voltage, equipment output voltage, collection level and required voltage ratio.

03

Fault & protection data

Short-circuit level, impedance requirement, vector group and protection philosophy.

04

Site conditions

Indoor or outdoor installation, temperature, altitude, humidity, dust, corrosion and space limits.

05

Standards & grid code

Applicable IEC requirements, utility specifications, insulation level and connection rules.

06

Delivery scope

Project schedule, inspection plan, drawings, test reports, packing and site-support requirements.

REVIEW-READY DOCUMENTATION

Built for EPC technical submittals.

Clear documents help your team review interfaces, confirm compliance and keep procurement moving.

01Technical datasheet
02General arrangement drawing
03Technical specification
04Routine / FAT test report
Transformer equipment prepared for EPC project documentation
TECHNICALDATA SHEET
PROJECTGA DRAWING

ZISHENG ELECTRICAL

One team across design, manufacturing and testing.

Since 2014Electrical equipment manufacturing experience
ISO 9001 & ISO 45001Quality and occupational health & safety systems
In-house capabilityDesign · Procurement · Manufacturing · Testing · Service

START YOUR EPC DISCUSSION

Share the project. We’ll help define the equipment scope.

Send a specification, single-line diagram or the basic project inputs. Our team will review the technical requirements and respond with the next questions.

Submitting opens your email application. You can attach specifications and drawings before sending.