You are here: Home » News » News

News

Latest News
未标题-1.png
News

How AI Data Centers Are Reshaping Power Demand

The digital landscape is shifting under the weight of Artificial Intelligence. While most of us see AI through a chat interface or a generated image, the real transformation is happening in the physical world.

28/03/2026
News
Zisheng_Oil_Immersed_Transformer_09_Africa_Engineer_Site.webp
News

Dry Type Transformer vs Oil Transformer: Which One Is the Best Choice for Your Project?

Choosing the wrong transformer leads to safety risks, inefficiency, and costly downtime. A poor decision can delay projects and increase expenses—understanding the right solution is essential.Dry type transformers and oil immersed transformers serve different purposes. Dry type transformers are idea

25/03/2026
News
Oil immersed transformer.png
News

What You Need to Know about Oil Immersed Transformer ?

The oil immersed transformer is a critical component in the electrical power industry, known for its efficiency and reliability in power distribution.

09/02/2026
News
winding-conductor-review-workshop.jpg

Transformer Winding Conductor Substitution Review: Geometry, Insulation and Design Evidence

A procurement briefing on reviewing winding conductor replacements: compare geometry, insulation, mechanical properties, manufacturing compatibility and design evidence before release.

dga-monitor-transformer-installation.jpg

Transformer Online DGA Monitor Interface: Oil Circuit, Mounting and Data Acceptance

An engineering guide to online DGA monitor integration: define the oil circuit, connection ownership, mounting envelope, data-quality states and acceptance records before transformer design release.

pasted-image-1791515259795.png

Transformer Electrostatic Shield Specification: Coupling Paths, Earthing and Verification

A procurement guide to transformer electrostatic shields, covering coupling paths, earthing interfaces, attenuation test conditions and traceable factory acceptance evidence.

a-fiber-featured.png

Transformer Fiber Optic Winding Temperature Monitoring: Probe Locations, Channel Identity and Acceptance

A design and procurement guide to optical winding temperature measurement, from embedded probe locations and optical paths to factory evidence and service records.

a-overfluxing-featured.png

Transformer Overfluxing Specification: V/Hz Envelope, Tap Position and Protection Inputs

A procurement and design review framework for translating voltage, frequency and tap-position cases into a transformer overfluxing envelope and coordinated protection inputs.

a-buchholz-interface-overview.png

Transformer Buchholz Relay Interface Review: Pipework, Contacts and Factory Release

A practical transformer Buchholz relay interface review covering pipework, alarm and trip contacts, factory evidence and site handover. Includes a decision table for traceable release and an explicit factory-to-site boundary.

We are willing to cooperate sincerely with clients all over the world with advanced technology, excellent quality, nice service, flexible operation and good reputation.

Quick Links

Products

Resource

Contact Us

 Telephone: +86-191-3128-5373
WhatsApp: +8619131285373
 Email: info@bdzstransformer.com
 Address: No. 6799, North Third Ring Road, Jingxiu District, Baoding City, Hebei Province
Copyright © 2025 Baoding Zisheng Electrical Equipment Co., Ltd. All Rights Reserved.